Serbia – Kolovrat
Location: PRIJEPOLIE, river LIM.
Installed power: 7,10 MW.
Yearly electric energy production: 38.300 MWh.
Electric energy needs for the consumption of around 19.000 families.
ITALIANO | ENGLISH
Serbia – Kolovrat
Location: PRIJEPOLIE, river LIM.
Installed power: 7,10 MW.
Yearly electric energy production: 38.300 MWh.
Electric energy needs for the consumption of around 19.000 families.