Indonesia – Sembilim A

photo Sembilin A

Location: LAE ITEM – NORTH SUMATERA, river LAE SEMBILIN.
Installed power: 8,5MW.
Yearly electric energy production: 51.400 MWh.
Electric energy needs for the consumption of around 25.500 families.